Engineering, installation and operations for solar, wind, hydro and storage projects. Protecting nature and the planet, together.
Why Choose Us
Half-cut cell technology keeps generation running even under partial shading.
The panels we use carry a 25-year performance warranty, retaining 90% of their power at year 12.
We work with turbines backed by complete spare-part and service support, covering blade, tail and body damage.
Through the partnership you reach 50+ engineers and ~2 GW of project experience.
Lithium-ion storage and SCADA load balancing enable grid-responsive dispatch.
In Numbers
References
From utility-scale solar to hydropower, these references reflect the engineering and field experience accessed through the partnership with SILEX EPC.
Services
Self-consumption solar systems for residential, commercial and industrial roofs, built on half-cut monocrystalline panels.
Read More
Self-consumption solar systems for residential, commercial and industrial roofs, built on half-cut monocrystalline panels.
Read More
Licensed and unlicensed ground-mount solar plants: site analysis, tracker structures, substation and grid integration in one scope.
Read More
Lithium-ion battery storage and hybrid plant design: plan generation around demand, not around the sun.
Read More
Wind turbines with full spare-part and service support — covering blade, tail and body damage — sized to match your existing solar system.
Read More
We stay with your plant after commissioning: monitoring, scheduled maintenance, fault response and performance optimisation.
Read More
Feasibility, project development and energy-efficiency consultancy — backed by the SILEX EPC engineering bench.
Read More
We analyse your site, consumption profile and grid-connection options, then lay out the real economics with an energy-balance and payback study.
Structural and electrical designs are prepared; permits, licences and the connection agreement are handled under one roof.
Equipment procurement, site installation and grid synchronisation are completed on schedule, to HSE standards.
Once live, the system is monitored remotely; scheduled maintenance and performance optimisation protect the production commitment.
The solar tree marries renewable generation with decorative landscaping; on-board storage in the trunk keeps power flowing at night and in emergencies. USB and 220V sockets, lighting and Wi-Fi options bring energy into public spaces.
Tell us what you need; we will plan the right solution together, starting with a site survey and feasibility study.