Services
Services
From survey to operations, under one contract: our solar, wind, storage and engineering services.
Rooftop Solar (PV)
Self-consumption solar systems for residential, commercial and industrial roofs, built on half-cut monocrystalline panels.
Read More
Ground-Mount Solar
Licensed and unlicensed ground-mount solar plants: site analysis, tracker structures, substation and grid integration in one scope.
Read More
Hybrid & Storage
Lithium-ion battery storage and hybrid plant design: plan generation around demand, not around the sun.
Read More
Wind Turbines
Wind turbines with full spare-part and service support — covering blade, tail and body damage — sized to match your existing solar system.
Read More
O&M Services
We stay with your plant after commissioning: monitoring, scheduled maintenance, fault response and performance optimisation.
Read More
Engineering & Consultancy
Feasibility, project development and energy-efficiency consultancy — backed by the SILEX EPC engineering bench.
Read More