Blog

News

Articles and updates on solar energy, storage and renewables.

Aerial view of solar panel arrays covering the full roof of an industrial facility Rooftop Solar

Rooftop Solar on a Factory: A Step-by-Step Guide for Industrial Facilities

From structural assessment to commissioning — the correct decision order for an industrial facility, and how the 2026 regulation affects the installed-capacity decision.

Engineering site drawings for an energy project with a scale ruler resting on them Regulation

Unlicensed Solar Permitting: Step by Step from Application to Acceptance

A practical guide showing which stage your file is at, why it is waiting, and how it can be accelerated.

Aerial view of a hybrid solar plant, its panel rows following the hillside contours Storage

Adding a Battery to an Existing Solar Plant: What Changed After Hourly Netting?

The difference between AC and DC coupling, which facilities it makes sense for, and how the investment decision is made.

Aerial view of a utility-scale solar power plant built across a valley floor Regulation

What Is Netting? An Hourly Netting Guide for Commercial Businesses (2026)

The move from monthly to hourly netting, its effect on the bill, and correct solar plant sizing.

A technician inspecting the surface of a solar panel closely during a site check Service

What Is Independent Inspection? An Owner's Engineering Guide for Solar Investors

The party building the plant runs its own quality control; independent technical verification protecting the investor is a separate owner's engineering function.

A technician tightening a solar panel mounting clamp with a cordless drill Storage

Adding Battery Backup to an Existing Grid-Tied Solar System

The steps for adding battery backup to make your grid-tied solar system resilient against power outages.

Two technicians in hard hats fitting a solar panel onto a rooftop mounting rail Regulation

Key Factors to Consider When Arranging Solar Energy Permits

What to know before applying for solar panel permits: local authority rules, zoning, panel dimensions, placement and fees.